Forms, Fact Sheets & Guides
- Stormwater Phase II Fact Sheet 3.0 (FDEP)
- Construction SWPPP Preparation Guide (EPA)
- Industrial SWPPP Preparation Guide (EPA)
- Notice of Intent (NOI)
- Notice of Termination (NOT)
- No Exposure Certification
- Final MSGP-2000
- Stormwater Pollution in the Workplace (SQG)
Fees
Permit | Fee |
---|---|
Large Construction (5 acres or more) | $400 |
Small Construction (1 and 5 acres) | $250 |
Multi-Sector Generic Permit (MSGP) | $500 (no change) |
No Exposure (NEX) | $200 |
Notice of Termination (NOT) | Free (no change) |