Utility Department Development Group
2023 Proposed Standards
St. Johns County Utility Department (SJCUD) Development Group is responsible for overseeing the planning, design, and construction of new water, sewer and reclaimed water systems within the SJCUD Service Area. All utility work must be approved by SJCUD prior to starting construction. Listed below are the manual, materials, details, and forms used by the Development group.
SJCUD has updated its Utility Standards effective February 1, 2023. View the 2022 Summary of the Changes. The proposed changes in procedures, design standards, construction specifications, approved materials, drawings and details, and forms used before, during, and after construction can be reviewed by clicking the links below. The proposed changes provide advances in materials, improvements in construction methods, and establish clarified processes and guidelines for utility installations. Questions and comments may be submitted in writing to the Development Engineer. Future changes will be considered beginning in January of each year with evaluation, adoption, and implementation being completed by July 1.
Planning Documents | Design Standards | Construction Process | Materials
Planning
Design
- Manual of Water, Wastewater, and Reuse Standards including a Summary of Changes
- Design Submittal Checklist
- Standard Details – 24" x 36" sheets in PDF format
- GN-01 – General Notes
- D-01 – General Details
- D-02 – General Details
- D-03 – Water Details
- D-04 – Water Details
- D-05 – Sewer Details
- D-06 – Sewer Details
- D-07 – Reclaimed Water Details
- PS-1 – Pump Station Detail
- PS Electrical Plan – 240V 200A
- PS Electrical Plan – 240V 100A
- PS Electrical Plan – 480V.pdf
- Pump Station Fencing Detail
Construction
- Construction Process Guidelines are now included in Part I of the Manual.
- Construction Forms
- Inspection Report Forms
- Project Close-out Documentation
- 3A - Interim Service Agreement
- 3B - Close out – Backflow Preventer Certification
- 3C - Close out – Release of Lien
- 3D - Close out – Schedule of Values (PDF) | (Excel XLSX)
- 3E - Close out – Warranty
- 3F - Close out – Bill of Sale
- 3G - Close out – Electronic As-built Drawing Submittal
- 3H - Close out – As-built Drawing Certification
- 3I - Close out – Special Warranty Deed
- 3J - Close out – Easement (Request from SJCUD Project Inspector)
Materials