CR 210 Roadway Improvements from I-95 to US 1

Dept. Contact

Email: ngottschalk@sjcfl.us

Quick Overview

This project will begin east of a current four laning project. 12 acres of right-of-way is needed. 150 feet of right-of-way with a rural typical section is anticipated. FDOT has constructed roadway and bridge improvements along CR 210 from the Sharp Curve over the railroad and US 1 to Valley Ridge Blvd.

Description

This project will begin east of a current four laning project. 12 acres of right-of-way is needed. 150 feet of right-of-way with a rural typical section is anticipated. FDOT has constructed roadway and bridge improvements along CR 210 from the Sharp Curve over the railroad and US 1 to Valley Ridge Blvd. Initially the bridge will be two lanes. Twin Creek Development proposes to 4 lane the CR 210 from the end of current 4 lane east of I-95 to the Sharp Curve. The language in the Twin Creeks Development Agreement (Ord. 2015-240) does not include the donation of right-of-way for the improvements. Later in their development they will 6-lane CR 210 across their property frontage and 4-lane the bridge over US 1 to Greenleaf Drive. The portion of CR 210 within the Twin Creeks boundary is being constructed to 6-lanes. The portion of CR 210 from the west Twin Creeks boundary to the end of the existing 4-lane section is being designed. The Fiscal Year 2025 budget for this project is $12,580,469.