Coastal Trolley Project

Preliminary Beach Trolley Concept Meeting

On October 7, 2026, St. Johns County hosted a community meeting to introduce a preliminary concept for a beach trolley system that could serve South Ponte Vedra Beach and Vilano Beach.

Overview

Project Background

St. Johns County is actively working with the U.S. Army Corps of Engineers to establish a long-term federal partnership to support beach restoration along the shoreline in South Ponte Vedra Beach.

To move forward, the County must identify a sustainable funding strategy for the required local cost share. One of the primary factors the U.S. Army Corps of Engineers uses to determine the local cost share is the amount of public beach access available within the project area.

The County is evaluating several potential options to increase public beach access in South Ponte Vedra Beach and improve the project’s financial feasibility. One option under consideration is a public transportation system with designated trolley stops that would provide access to existing County-owned properties within the project area.

The potential trolley system could also include stops at existing public access locations throughout Vilano Beach, which could benefit the existing U.S. Army Corps of Engineers project cost share in that area. Additionally, the transportation system could support broader County mobility efforts.

At this stage, the trolley concept remains under evaluation. No decisions have been made regarding the location of trolley stops or whether the County will ultimately pursue the option. Community input will help inform the County’s evaluation as it considers the potential benefits, challenges, and feasibility of the concept.

Residents and community members are encouraged to view the meeting materials, ask questions, and provide feedback. Feedback may be submitted to St. Johns County Coastal Management at 904-209-0260 or coastalprojects@sjcfl.us.

Frequently Asked Questions

Funding Questions

What is the total cost of the new USACE project?

The total project cost is estimated at $138 million over the 50-year project life.

What would be the cost to oceanfront property owners for an MSTU if the federal cost share is not increased by a trolley system? Would there still be an MSTU required if the federal cost share is maximized by a trolley system? If so, how much would it be? 

The specific details of an MSTU for the project area have not been developed.

Can Tourist Development Council taxes be used wholly or partly to pay the project funding gap instead of the trolley system and/or another MSTU? 

The current level of funding that the TDC has available will not provide enough funding to support the project.

Logistics

How were the locations of the trolley stops determined?

The stops’ locations were determined in a way that maximizes the federal cost share. For the federal portion, for every public access location, we earn ¼ mile of eligible shoreline in each direction (1/2 mile total). Therefore, placing stops approximately ½ mile apart maximizes the federal portion of the cost share. Additionally, the proposed trolley locations are all county owned easements / land with no new property acquisition required.

What would be the days and hours of the proposed trolley system? 

The currently proposed schedule is to run the trolley during daylight hours. The frequency would be determined by USACE requirements and public input. Although trolleys will not run 24 hours a day, the access points would not be closed nor restricted at any time.

Will there be facilities/amenities at each trolley stop? 

The plan currently does not include restroom or trash facilities at the new access locations. The design includes bicycle racks at each location.

Will any new public beach accesses be ADA-compliant? 

The trolley will connect with existing ADA-compliant beach access locations.

What is the timing of implementation of the trolley system? 

Many factors will influence the timeline, such as funding, design, permitting, regulatory agency reviews, turtle nesting season timing, etc. To maximize the beach restoration cost share, it would need to be implemented prior to initial renourishment begins, which is estimated to be Summer 2029. 

Has FDOT made recommendations on the structure and completed a safety assessment? Also, has FDOT done a traffic assessment? 

Public Outreach was the priority; approaching FDOT would be the next step in this process. FDOT has not yet done a traffic assessment on this proposal. 

Implementation

What mitigation measures are proposed if impacts exceed expectations?

The County/agencies would assess and make changes to best serve the community.

A1A is a state highway, and I am concerned about the safety of both the public using the trolley as well as other drivers with multiple public accesses and trolley stops. How does the county plan to make this trolley system safe for everyone? 

The County will follow all required safety guidelines when implementing the trolley system. Drop-off and pick-up would only occur northbound, or at existing lighted pedestrian crossings. There would be tapered lanes for the trolley to pull off of the road while loading and unloading. Signage would be at every stop.

What design features or operational restrictions are proposed to minimize impacts on nearby residents? 

It would be a daytime operation only. There would be signage to prevent public parking within the trolley parking area. The boardwalks with railings and signage would deter the public from accessing neighboring private properties. 

What environmental assessments have been completed, and what impacts are anticipated to coastal resources, stormwater, vegetation, and wildlife? 

The planned boardwalks would limit impact to coastal resources with the intent to preserve any existing dune and vegetation. The project would be required to obtain permits from all agencies having jurisdiction.

How were nearby residents and stakeholders notified and involved during project inception/development? 

Nearby residents were notified through a mailed letter inviting them to attend the County’s public meeting. Notification was also sent to the local community groups and stakeholders. The recorded presentation is available on our website, along with other resources. Residents are encouraged to provide us with their feedback by emailing or calling Coastal Management. Community feedback will lead us to the best path forward.

Which project elements are finalized, and which remain open for public input? 

No element has been finalized. This project is in the preliminary planning phase and remains open for public input and feedback. Depending on interest, future meetings may be held to further discuss the topic.