CR 2209 (Central) from CR210 to CR208
Dept. Contact
Email: vpacetti@sjcfl.us
Quick Overview
This roadway is proposed to be a four-lane section with 250 foot of Right-of-Way.
Email: vpacetti@sjcfl.us
This roadway is proposed to be a four-lane section with 250 foot of Right-of-Way.