CR 2209 (Central) from CR210 to CR208

Dept. Contact

Email: vpacetti@sjcfl.us

Quick Overview

This roadway is proposed to be a four-lane section with 250 foot of Right-of-Way.

Description

This roadway is proposed to be a four-lane section with 250 foot of Right-of-Way. The Central segment is 7.7 miles from CR 210 to SR16. The current construction project is 3.9 miles from Silverleaf Parkway to SR 16.